Office Fit Out

CLIENT

​LOCATION


Interiors

SCOPE OF WORKS

The existing space needed to be transformed to accommodate a new tenant who required eight classrooms in order to host lessons and examinations.


The project specification was to build eight teaching rooms. This consisted of erecting stud partitions, fixing 12.5mm plasterboard, with insulation infill to prevent noise within the rooms, and dry lining and painting. Calztec also installed window and door frames, with eight doors, vision panels, skirting, keypad entry system on eight doors and projector installation in each classroom.


The end result is an area which utilises the space to allow the most efficient use of the classrooms for the tenant. The area is clean, bright and in-keeping with MSO's branding for their office space.

0330 113 4500​

MSO Workspace

Birmingham City Centre


GALLERY

11 Brindley Place